November Stretch

Cold few days but we are still keeping everything on schedule.

Gerry and Ali braved the cold days and continued with the shadow line prestained siding and framing. Next up will be the upper floor metal siding. 

Mudbucket crew were laying the final layer of mulch on the paved area and they installed conduit under the front driveway and trenched west car park for irrigation lines.

Brett finished off the miscellaneous roof flashings

Corey from finished off the final connections to the geothermal

Sharat came by and did the electrical inspection


Next up will be the Spray Foam. We should have some videos up next update.